Project Management Service including:
- Space planning & design service
- Risk Assessments & method statements
- Delivery & installation schedule
Inspirational office refurbishment following corporate growth
Rockstar is a dedicated quality assurance and localisation studio, located in the East Midlands (UK) with head offices based in New York.
The original refurbishment in 2015 involved a complete project-managed service including the supply and delivery of office, reception, breakout, kitchen and dining room furniture.
Following continued successful growth, Rockstar once again chose MACOI as their preferred partner to fit out their new third-floor space, completing the existing inspirational and functional office environment with modern bench desking, ergonomic seating and canteen furniture.
The furniture selected to refurbish Rockstar not only reflected their ethos and activities but was carefully selected to be adaptable to accommodate their various teams and flexible to accommodate growth.
“I approached MACOI because I had previously used them (Account Manager Steve Robinson) to provide office supplies whilst working for Nottinghamshire Police Force.
MACOI helped me by not only providing all items requested but also spent a lot of time planning the fit-out in great detail. Steve organised a visit to many London showrooms to give us an idea of what types of furniture and fabric options were available to us. This combined with the detailed plans provided gave us a real feel for what we could expect the new office to look like.
The result was impressive. MACOI managed the entire office fit-out to ensure that our company was able to stick to deadlines and this enabled us to move into our new premises on the target date with no issues experienced along the way. All furniture was delivered on schedule and risk assessments were carried out by MACOI to ensure that all their staff members were aware of how they were expected to act whilst on site.
One thing I liked was the on-site presence of Steve. He was on site regularly to ensure that things went to plan. He and his team were happy to work with other contractors which allowed the office move project as a whole to run to schedule. If the job ever looked like it was falling behind schedule, Steve arranged additional labour to ensure the project would be completed on time.
I would recommend MACOI to an individual/company that requires a professional approach to any medium/large scale office-based project work. They are happy to take on the responsibility of any project and feedback their ideas and options in a timely manner. All in all, more than impressed. A job very well done.”
John Lees, Facilities Manager
Cambridgeshire
Unit 6-8 Centree House
River Road
Bicton Industrial Park
Kimbolton
Cambridgeshire
PE28 0LQ
Suffolk
Suite 3.11, Felaw Maltings
44 Felaw Street
Ipswich
Suffolk
IP2 8SJ